The Production Technology 2 Laboratory is used to measure petrophysical rock parameters. It is used to teach PET12404-Reservoir Petrophysics (+Lab). The system is capable of operating at a wide range of pressure and core sample sizes (from 1.00 inch to…
The Drilling Fluid and Cementing Laboratory is used for experimental purposes and equipped with the state-of-the-art equipment from Fann Company. The laboratory comprises a variety of tools including drilling fluids and cement equipment. The results of the experiment on drilling…
The Reservoir Laboratory, often called the core flooding Lab, is used for experimental purposes. The laboratory can determine the rock permeability, and how well various fluids, including oil, will flow through it under 3-axis stresses. A number of tests, ranging…
PVU-Schlumberger Department is sponsored by Schlumberger (SLB) with various software packages including Petrel Eclipse, Production, Techlog. Specifically, the Petrel software package helps students build geological models, the Eclipse package helps students simulate the reservoir, production history matching, and production forecast,…
The software package is sponsored by BHGE company worth US$5.4 million, including MFrac Package Pro (Site), GMI SFIBTM (Site), GMI MohrFracsTM (Site), GMI ImagerTM (Site), GMI CaliperTM (Site), JewelSuiteTM GeoMechanics Package (Site) to serve simulation of the fracture propagation, the…
Showroom of Drilling and Production Facilities shows rig models, drill ships and drilling capabilities of rigs and drill ships and production model facilities. In addition, on drilling ships and drilling rigs, there are models of basic drilling systems on the…